Septic pumping and repair in Solon Township, Michigan

Drawing of a septic pumping truck on a driveway, its hose running across the lawn into an open tank lid, with a worker holding the hose.

In short

  • Pumping: the EPA's general figure is $250 to $500 every three to five years.
  • Repair or replacement: Kent County Health Department permit, $300.
  • The township's 2018 plan says public sewer from Cedar Springs is available near the US-131 and 17 Mile Road interchange.
  • Township zoning: no septic system within 100 feet of Duke Creek.
  • Home sale: the county evaluates well and septic together for $295, septic alone for $250.

What to do when a septic system in Solon Township, next to Cedar Springs, needs pumping, a repair or urgent help, and where the township's 2018 plan says public sewer is available. Every fact links to its official source.

13 official sources Checked

Septic tank pumping in Solon Township

$250 to $500 A general EPA figure for routine septic maintenance every three to five years. It has no date and is not a Solon Township price. Each company sets its own rate, so get the price on the phone first. Source: Why Maintain Your Septic System

Solon Township's master plan lists promoting regular maintenance and inspection of septic systems among its natural resource policies, to reduce E. coli reaching local waters.

Michigan licenses the companies that do this work: the Michigan page explains who may pump a tank and how often.

Source: Solon Township Master Plan 2018, Planning Dimensions (Natural Resource Protection Policy, pages 57 to 58)

Related rules

Septic repair or replacement in Solon Township

Drawing of a small excavator digging in a backyard beside a new concrete septic tank, with a worker in a hard hat guiding.
$5,000 to $15,000 What the EPA says it can cost to repair or replace a malfunctioning conventional system. The figure is general, undated and not local, and the EPA says alternative systems can cost even more. A written quote for your own lot is the only real number. Source: Why Maintain Your Septic System

The permit for a septic repair or replacement in Solon Township comes from the Kent County Health Department, whose residential application lists Septic (Repair/Replacement) at $300. The township's own building form sends owners to the same department.

Near Duke Creek, a township zoning rule adds a 100-foot limit for septic systems. Details are further down this page.

Source: Application for Residential Septic/Well Project (PDF)

Related rules

Sewage backing up in a Solon Township home

Drawing of a basement floor drain with dark water pooling around it, rubber boots at the edge of the puddle, a washing machine and sink behind.

The EPA's advice, with the Solon Township contacts:

  1. Avoid contact with the sewage. The EPA says it may contain harmful pathogens.
  2. The EPA says to contact your local health department or regulatory agency.
  3. Home on a septic system: the Kent County Health Department issues the permits. Its permit form prints (616) 632-6900 and gives no office hours.
  4. Home connected to Cedar Springs sewer: the City of Cedar Springs FAQ publishes its DPW number for a suspected sewer plug, (616) 696-1330, ext. 108. To check which system an address is on, the township office's published number is (616) 696-1718, Monday to Wednesday, 9am to 5pm.
Source: Resolving Septic System Malfunctions

Related rules

Septic inspection for a home sale in Solon Township

Drawing of a man with a flashlight checking an open septic tank lid on the front lawn of a house with a for-sale sign post.
$250 or $295 The Kent County Health Department's charge for a Real Estate Evaluation on its application form, read on November 16, 2026: $295 when the home has a well and a septic system, $250 for the septic system of a home on municipal water. Source: Application for Sanitary Facility/Real Estate Evaluation (PDF)

Solon Township's plan says nearly all the township relies on groundwater for drinking water, and Kent County evaluates a well and a septic system together when a home has both. The county says its evaluation is often required before selling an existing building.

The county and state pages explain who asks for the evaluation and what it covers.

Source: Septic & Well (Permits & Evaluations)

Related rules

Sewer or septic in Solon Township

  1. Is my part of Solon Township on public sewer?

    The township's 2018 plan says public water and sewer facilities are available near the US-131 and 17 Mile Road (M-46) interchange. It describes the majority of the township as rural, with densities influenced by the lack of public utilities.

    Details and source

    The plan has no street list, and it adds that it does not suggest planning public water and sewer for rural areas. To confirm one address, ask the township office at (616) 696-1718. Septic permits come from the Kent County Health Department.

    The source says: “Public water and sewer facilities are currently available near the US-131 and 17 Mile Road (M-46) interchange”
    Source: Solon Township Master Plan 2018, Land Use Characteristics (Sanitary Sewer and Water Services, page 34)
    Cross-section drawing of a street: one house connected to the public sewer main under the road, the next house with its own septic tank in the yard.
  2. Who runs the sewer, and can it be extended to my property?

    The sewer is the City of Cedar Springs system, shared under a development agreement with Solon Township. A Service Area of almost 446 acres west of US-131 may connect to city water and sewer if utilities become available there, and stays in Solon Township.

    Details and source

    East of US-131, about 217 acres remain in Solon Township until the owner requests water and sewer development; the property is then transferred to the city. The township's 2018 plan says sewer extensions in the Service Area depend on the township paying all construction costs and on capacity. The city's plant is designed for 2.4 million gallons a day and treats approximately 600,000.

    The source says: “If utilities become available in this area, these properties may connect to city water and sewer”
    Source: City of Cedar Springs Master Plan 2025 (adopted November 13, 2025), 425 Agreement Area
  3. What does Cedar Springs charge for sewer?

    The city's 2026 Fee Schedule lists Sewer Hook-up at $2,600 and Sewer Inspection at $60. Sewer usage is $8.58 per 1000 gallons, plus a Sewer Ready to Serve fee of $27.21 a month for a 5/8 inch meter.

    Details and source

    The schedule took effect July 1, 2026 (Resolution 2026-17). It lists the hook-up under Water/Sewer Availability Fees and does not say whether other amounts apply to a property that stays in Solon Township, so ask Cedar Springs City Hall before budgeting. The schedule also lists a Lateral/Service Fee at actual cost plus a 6% administrative fee.

    The source says: “Sewer Usage $8.58 per 1000 gallons”
    Source: 2026 Fee Schedule (Resolution 2026-17, effective July 1, 2026)
  4. What does the township say about soil, groundwater and septic systems?

    The 2018 plan says sandy soils, limited aquifer protection and high-water tables keep groundwater susceptible to contamination from septic tanks and drain fields. It says these conditions are likely to increasingly limit their future use in many portions of the township.

    Details and source

    In the township's 2016 online survey (165 questionnaires), 90% of respondents said their drain field was good. How the land is checked before a system is approved is on the Kent County page.

    The source says: “These conditions are likely to increasingly limit the future use of septic tanks and drain fields in many portions of the Township.”
    Source: Solon Township Master Plan 2018, Land Use Characteristics (Sanitary Sewer and Water Services, page 34)
  5. How close to Duke Creek can a septic system be built?

    No new or enlarged system closer than 100 feet. The township zoning ordinance bars building, installing or enlarging a septic system, a dwelling or an accessory building within 100 feet of Duke Creek, a tributary of the Rogue River.

    Details and source

    The distance is measured from the shoreline or ordinary high water mark (Section 3.14). The ordinance read here carries amendments effective through September 14, 2026. The county's own distances are on the Kent County page.

    The source says: “no dwelling, accessory building, or septic system shall be hereafter constructed, erected, installed, or enlarged within a minimum of 100 feet”
    Source: Solon Township Zoning Ordinance (with amendments effective through September 14, 2026), Section 3.14
  6. I'm building or adding on. What does the township ask about the septic system?

    The township's Building Permit Application says septic and well approval are necessary before any application may be made, and that you must have a Water Supply/Waste Water Disposal Facility Permit from the Kent County Health Department.

    Details and source

    For any project other than new construction, the form asks for the county's Change of Use Review, approved, before permits are issued. It says a remodel or addition may be able to omit the septic permit if the township can confirm the address. Form revision 2-10-2025. The zoning ordinance (Section 3.08 H) requires a dwelling on a lot of less than one acre to connect to a public or state-approved community sewer system, with exceptions for lakefront lots in the R-1 District, legal non-conforming lots and lots of record.

    The source says: “Truss Drawings and Septic and Well Approval are necessary before any application may be made.”
    Source: Building Permit Application (Rev 2-10-2025)

Solon Township facts

Population (Census Bureau estimate, July 1, 2024; April 1, 2020 estimates base 6,494)
6,626
Source: Subcounty Resident Population Estimates: April 1, 2020 to July 1, 2024 (Michigan file, Vintage 2024)
How the township's plan describes itself, with densities influenced by the lack of public utilities
The majority of Solon Township is rural
Source: Solon Township Master Plan 2018, Land Use Characteristics (page 34)
Share of the township that relies on groundwater for drinking and household activities
Nearly all the township
Source: Solon Township Master Plan 2018, Natural Features (page 12)
Survey respondents who said their drain field was good (2016 online survey, 165 questionnaires, reported in the 2018 Master Plan)
90%
Source: Solon Township Master Plan 2018, Public Participation (page 45)
Service Area intended for sewer extensions, provided the township pays all construction costs and capacity requirements are met
approximately 446 acres
Source: Solon Township Master Plan 2018, Land Use Characteristics (page 34)
Phase II land east of US-131 that stays in Solon Township until the owner requests water and sewer development
approximately 217 acres
Source: City of Cedar Springs Master Plan 2025, 425 Agreement Area
City of Cedar Springs wastewater treatment facility: design capacity and current flow
2.4 million gallons a day; approximately 600,000 treated
Source: City of Cedar Springs Master Plan 2025, Utilities
Paperwork the township's building form asks for on any project except new construction
Change of Use Review from the Kent County Health Department
Source: Building Permit Application (Rev 2-10-2025)
Solon Township office (the township's own published contact)
15185 Algoma Ave. NE, Cedar Springs, MI 49319; (616) 696-1718; Monday through Wednesday, 9am to 5pm
Source: Contact
City of Cedar Springs DPW, the number the city's FAQ publishes for a suspected sewer plug (written for the city's sewer customers)
(616) 696-1330, ext. 108
Source: FAQ (How do I report a water or sewer problem?)
Kent County Health Department, Environmental Health Division (the department's own published contact)
(616) 632-6900; 700 Fuller Ave NE, Grand Rapids, MI 49503
Source: Application for Residential Septic/Well Project (PDF)

Kent County rules that apply in Solon Township

Sources for this page (13)

  1. Solon Township Master Plan 2018, Planning Dimensions (Natural Resource Protection Policy, pages 57 to 58)
    Solon Township. Retrieved .
  2. Why Maintain Your Septic System
    U.S. Environmental Protection Agency. Retrieved .
  3. Application for Residential Septic/Well Project (PDF)
    Kent County Health Department, Environmental Health Division. Retrieved .
  4. Resolving Septic System Malfunctions
    U.S. Environmental Protection Agency. Retrieved .
  5. Septic & Well (Permits & Evaluations)
    Kent County Health Department. Retrieved .
  6. Application for Sanitary Facility/Real Estate Evaluation (PDF)
    Kent County Health Department, Environmental Health Division. Retrieved .
  7. City of Cedar Springs Master Plan 2025 (adopted November 13, 2025), 425 Agreement Area
    City of Cedar Springs. Retrieved .
  8. 2026 Fee Schedule (Resolution 2026-17, effective July 1, 2026)
    City of Cedar Springs. Retrieved .
  9. Solon Township Zoning Ordinance (with amendments effective through September 14, 2026), Section 3.14
    Solon Township. Retrieved .
  10. Building Permit Application (Rev 2-10-2025)
    Solon Township. Retrieved .
  11. Subcounty Resident Population Estimates: April 1, 2020 to July 1, 2024 (Michigan file, Vintage 2024)
    U.S. Census Bureau. Retrieved .
  12. Contact
    Solon Township. Retrieved .
  13. FAQ (How do I report a water or sewer problem?)
    City of Cedar Springs. Retrieved .

Rules change. The linked official document is the authority, this page is a summary of it and is not legal advice.

Rules above Solon Township